Fashion Design PC Material Injection Chair Mould

Plastic Chair MouldAs a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed. Name Description  Products\'

Featured Products

Plastic Chair Mould

As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.

Fashion Design PC Material Plastic Injection Chair Mold
Fashion Design PC Material Plastic Injection Chair Mold
Fashion Design PC Material Plastic Injection Chair Mold



 
Name Description  
Products' infomation we need to make quotationClear Pics/material/size/weight/wall thickness/targetting quantity and etc.  
Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKd61 etc  
Mould Base LKM, HASCO ect.  
Cavity Single/multi  
Runner Hot/cold   
Mould Design3D/2D Drawing  
Design Days 3 days  
Design Software UG, PROE, CAD, CAE, CAM, CAXA ect   
Plastic MaterialPP, PC, PS, PE, PU, PVC, ABS, PMMA ect   
Mould Life 300, 000-3, 000, 000 shots   
Injection SystemPin-point-gate  
Polish SystemMirror Polish  
Payment40% of Deposit by T/T, 60% of Balance by T/T  
Delivery Time 15-60days   
Specification Depends on customers requirements   
Business Step 
1. R& DWe support customer R& D. Make the files or improve the design if you needed 
↓ ↓ ↓
2. Quotation MakingMould Quotation will be finished in 1 day according to information we get
↓ ↓ ↓
3. Negotiation The quality, price, material, delivery time. payment item. ect 
↓ ↓ ↓
4. Mould Design 3-5 days for mould and product 3D/2D drawing design
↓ ↓ ↓
5. MouldAccording to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days 
↓ ↓ ↓
6. Mould TestingWhen moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.
↓ ↓ ↓
7. Sample shoot If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory 
  ↓ ↓ ↓  
8. Delivery Delivery goods by sea or by air, according  customers requirement 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours